Get the installation work started

The following steps are involved in this phase:

  • Removing the former roofing if any.
  • Installation of underlayment

Position at one roof’s side a roll of underlayment perpendicular to roof’s eave.

Roll the underway while keeping bottom edge in line with eave’s edge maintaining it above any synthetic or metal edging which may cover eave’s border.

Secure laid underlayment using nails at a separation distance of 24’’ interval. The nails to be at least 2’’ above the roof edge. At the roof end cut the roll of underlayment such that it matches edges then secure using nails.